Photogrammetry add-on

Turn a drone flight into a survey-grade 3D model for PV planning

Plan PV projects on real measurements, not guesswork. Fly the roof, upload your imagery, and get a high-precision 3D model and orthophoto quickly, ready to import. *Less than 1 hour if <150 pictures, less than 3 hours if more.

Powered by · Credits valid 12 months · Top up anytime

Why installers add it

The most accurate way to plan a roof

Photogrammetry gives you a true digital twin of the building. Better data in means better plans, faster offers, less time spent for technical project management and ultimately a more profitable business.

Survey-grade data
The best possible geometry of every roof. Plan on real measurement instead of estimates from satellite imagery.
Specialist processing
Highest-quality 3D outputs processed by the photogrammetry specialists at Airclip.
Fast calculation times
Don't wait hours. Upload your drone imagery and get a finished 3D model back in less than 1 hour if under 150 pictures, and less than 3 if more.
Cost-efficient at any volume
Pay per project with credits that scale. The bigger the pack, the lower your cost per roof.
Seamless in Eturnity Expert
Import models and orthophotos straight into your existing project workflow.
Stunning, true-to-site 3D
Orthophotos and high-fidelity models add a presentation-ready twin of the building to every quote.
Comparison

Compared to other PV software

Eturnity Expert

Sharp top view

Other PV Software

Blurry top view

Eturnity Expert

Accurate 3D imagery

Other PV Software

Inaccurate 3D imagery
How it works

3 Steps

When you’re ready, picking and activating the add-on takes minutes.

1. Sign Up

Choose your package and get started

Once you have an Eturnity Expert account, you can pick the credit add-on that fits your project volume. Your Airclip account is created automatically after a short confirmation of your email address. It’s purchased directly through Eturnity and added to your invoice.

✓ Select a Photogrammetry add-on based on your credit needs

✓ Get an Airclip Cloud account provisioned

✓ One supplier, one invoice – everything goes through Eturnity

2. New to drones?

We'll get you confidently flying

Never ran a photogrammetry mission before? Together with Airclip we provide detailed video guidance on capturing excellent results, and Airclip support is there whenever you hit a snag.

✓ Step-by-step video guides for great capture, every time

✓ Best-practice flight patterns and settings from the experts

✓ Direct Airclip support if you run into difficulties

3. Use it

Fly, upload and import your model

Fly the roof with your drone, drop the imagery in the Airclip Cloud upload and receive a ready-to-import 3D model and orthophoto for the Eturnity platform.

✓ Fly the building with your drone (max 1500 images per project)

✓ Open the drone-import section in Eturnity which guides you straight to Airclip cloud

✓ Get a 3D model and orthophoto back in a very short time, ready to import in Eturnity

Plans

Choose from 3 add-on plans

Pick the add-on plan that fits your team. Pricing available once you start your free trial, or through the Eturnity Expert for existing customers.

Eturnity x Airclip

Precise data, in your existing workflow

Eturnity and Airclip both build around precision, which is why the fit works: Eturnity is your planning and sales platform, Airclip brings the drone photogrammetry. Together, you get survey-grade data without leaving your workflow. That means an accurate 3D model, a fair cost per project, and skipping long waits and reworks.

Are you new to Eturnity?

Get a free trial

  • Receive a trial account for 14 days.
  • We'll walk you through the Airclip add-on during your trial.
  • Get a pre-rendered 3D model for testing.
Start your free trial now and get a pre-rendered 3D model for testing.
14 days of Eturnity Expert. No credit card required.
By submitting, you agree to our Privacy Policy.

Trusted by 2500+ renewable energy installers and partners.