String Design sizes the right inverters, wires the modules into strings and assigns them to the MPP trackers. Eturnity continuously checks that the wiring is electrically sound.
Try for free
What it is for
One string design for planning, sales and costing.
-
Planning and installation
Prepare the installation and technical documents. The finished string design is the basis for the string plan and the single-line diagram.
-
Sales
See before the quote whether the chosen inverters electrically match the system.
-
Costing
Inverter costs go straight into the bill of materials.
Automatic inverter sizing
Sized automatically. Refined by hand.
Automatic sizing delivers an electrically correct solution in a few steps. Because on-site installation rarely follows the calculation model exactly, you can then adjust every string by hand or draw the whole wiring yourself.

Automate the sizing
- Answer questions about the project: grid connection, battery, optimizers
- Choose inverters from your own library
- Compare proposals: wiring, DC/AC ratio and price
- Accept: the strings are ready on the roof
Supports optimizers from Tigo and BRC Solar.

Draw and adjust strings
- Choose an MPPT, click modules or drag with the mouse button held down
- Drag and drop a string onto another MPPT
- Every string in its own colour, every change saved instantly
- Electrical compliance check in real time
Inverters can also be selected manually, with a technical compatibility check.
✓ Saved in the project file manager
Electrical check
Every string electrically checked.
A coloured badge shows the result: Valid, Note, Warning, Error or Manual. An icon on the inverter, MPPT and string shows exactly where something needs checking.
- Open-circuit voltage extrapolated for cold modules, with an adjustable minimum temperature (factory setting −10 °C)
- Short-circuit current checked including safety factor according to IEC 62548
- Unequal strings and different orientations on the same MPPT are detected
- Check result as a compliance report (PDF), drawing exportable as DXF
Practical knowledge built in
What matters when sizing.
-
DC/AC ratio
A slightly smaller inverter is usually more economical. Factory target value 110 %, adjustable higher for east-west systems.
-
One MPPT per orientation
The weakest module slows down the whole string. Different orientations belong on separate MPPTs, except with optimizers.
-
Shading when wiring
Group modules that are shaded at the same time of day in one string. That way they do not slow down the other strings.
-
Company-wide settings
Administrators set module temperatures, safety factor, target ratio and string naming centrally. All projects are sized the same way.
String Design in Eturnity
From string to single-line diagram.
In one project.
Inverter sizing, string wiring and electrical checks as the basis for the string plan, single-line diagram and bill of materials.
Try for free